Quick Answer: How do you change a project base point to a survey point in Revit?

In the site plan view or another view that displays the survey point, select the survey point. Click the clip to change its state to clipped or unclipped, depending on how you want to move the survey point. Read the following sections for more details. Drag the survey point to the desired location.

How do you set up a project base point and survey point in Revit?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

How do you set a survey point?

Define the Survey Point

  1. Open the site plan view or another view that displays it. …
  2. To select the survey point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. If the survey point is clipped, click to unclip it.
  4. Drag the survey point to the desired location.
IT IS IMPORTANT:  What are building plans and specifications?

How do you make a survey point visible in Revit?

First, make sure that Survey Point is enabled in Visibility / Graphics settings. In Visibility / Graphics settings window go to Model Categories -> Visibility -> Site and make sure that “Survey Point” is enabled. After that in the Revit site view, the Survey Point block should appear.

How do you hide project base point and survey point in Revit?

To temporarily display the project base point and the survey point in a view, on the View Control Bar click (Reveal Hidden Elements).

How do I reset a project base point in Revit?

If you later want to return the project base point to its startup location, do the following:

  1. Select the project base point and unclip it.
  2. Right-click the project base point, and click Move to Startup Location.

What is Project Base Point?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. Initially, in stock templates, it identifies the origin (0,0,0) of the project coordinate system. Use the project base point as a reference point for measurements across the site.

What are true survey points?

It represents a known point in the physical world, such as a geodetic survey marker or the intersection of 2 property lines. The survey point is used to correctly orient the building geometry in another coordinate system, such as the coordinate system used in a civil engineering application.

What are the 3 points in Revit?

3- The Spot Coordinates, Spot Elevation and Levels tools set to “Survey Point” don’t actually reference the Survey Point, they refer to the Shared Site Origin. 4- Set the Shared Site Origin and Survey Point early on in the project.

IT IS IMPORTANT:  Question: How do I get technical support on Autodesk?

Which list of commands are valid for point creation?

In the Create Points dialog box, choose commands from the following lists:

  • Miscellaneous.
  • Intersection.
  • Alignments.
  • Surface.
  • Interpolate.
  • Slope.
  • Import Points.

How do I project a base point in Revit?

Define the Project Base Point

  1. Open the site plan view or another view that displays it. …
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. Drag the project base point to the desired location.

Where is my project base point Revit?

To see the base point in your revit model, open a site plan and then the visibility graphics window. Expand the Site Category, then make sure the Project Base Point is set to visible. Next select the project base point in the Revit View, and click on the paperclip icon.

How do I find project coordinates in Revit?

Relocate the Model by Specifying Coordinates

  1. Optional: Display the project base point and the survey point in the current view.
  2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
  3. Place the cursor on a reference point of the model. …
  4. Click the reference.

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.

dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

How do you unlock visibility graphics in Revit?

The Visibility/Graphics window will be greyed out (as shown above) if its included in the View Properties of the View Template. So make sure you go into the View Template and update the Visibility/Graphics or change settings to not included Visibility/Graphics.

IT IS IMPORTANT:  How do I change the default dimension style in Autocad?

How do you remove coordinates in Revit?

Next, acquire the coordinates from this project (Manage > Coordinates > Acquire Coordinates > Select the text from the newly linked Revit model). Select the same text again and delete the link. A dialog box will appear, select ‘Delete Link‘.